Repair work continues on the Fond du Lac Lakeside Park Lighthouse. Fond du Lac Advisory Park Board member John Papenheim says crews have removed and replaced siding, and rotted studs, along with concrete cap, cleaning and tuck pointing. Meanwhile, Papenheim says work is also ongoing on a major street and parking lot renovation project on Lighthouse Drive. All of the work is slated to be completed by the end of May.